{"id":999979043,"date":"2025-10-30T18:20:04","date_gmt":"2025-10-30T11:20:04","guid":{"rendered":"https:\/\/bizzi.vn\/?p=999979043"},"modified":"2026-06-03T23:33:54","modified_gmt":"2026-06-03T16:33:54","slug":"epm-implementation-error","status":"publish","type":"post","link":"https:\/\/bizzi.vn\/en\/epm-implementation-error\/","title":{"rendered":"EPM Implementation Mistakes \u2013 Common Errors and How to Avoid Them"},"content":{"rendered":"<p>Technology is just a tool \u2013 people and data are the real foundation of performance transformation. EPM implementation failures do not come from software, but from a lack of comprehensive preparation at the strategic level. When businesses view EPM as a management project, not just a technology project, the likelihood of success increases many times over.<\/p>\n<p><span style=\"font-weight: 400;\">In the following article, Bizzi will clarify two issues:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Common Errors and Mistakes in EPM Implementation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">How to avoid failure when implementing EPM<\/span><\/li>\n<\/ul>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_80 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Index<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#Tai_sao_nhieu_doanh_nghiep_gap_sai_lam_trien_khai_EPM\" >Why do many businesses make mistakes in implementing EPM?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#1_EPM_la_gi_va_tai_sao_trien_khai_phuc_tap\" >1. What is EPM and why is it complex to implement?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#2_Trien_khai_EPM_Hanh_trinh_thay_doi_van_hoa_du_lieu\" >2. EPM Implementation: The Journey of Changing Data Culture<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#3_Sai_lam_trien_khai_EPM_Tu_cong_nghe_den_con_nguoi\" >3. EPM Implementation Mistakes: From Technology to People<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#6_sai_lam_trien_khai_EPM_pho_bien\" >6 Common EPM Implementation Mistakes<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#1_Quan_tri_du_an_yeu_Project_Governance_Failure\" >1. Project Governance Failure<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#2_Du_lieu_kem_chat_luong_Data_Quality_Integration_Issues\" >2. Poor Data Quality &amp; Integration Issues<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#3_Thieu_dao_tao_va_quan_ly_thay_doi_Training_Change_Management\" >3. Lack of training and change management<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#4_Over-Customization_Technical_Complexity\" >4. Over-Customization &amp; Technical Complexity<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#5_Khong_xac_dinh_KPI_va_ROI_ro_rang\" >5. Not defining clear KPIs and ROI<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#6_Thieu_ngan_sach_hoac_sai_uoc_luong_chi_phi\" >6. Under-budget or incorrect cost estimates<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#Nguyen_nhan_goc_re_cua_trien_khai_EPM_that_bai\" >Root Causes of Failed EPM Implementations<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#1_Thieu_ke_hoach_tong_the_va_roadmap_ro_rang\" >1. Lack of a clear master plan and roadmap<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#2_Thieu_lien_ket_giua_tai_chinh_IT\" >2. Lack of connection between finance &amp; IT<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#3_Chua_danh_gia_san_sang_du_lieu_data_readiness\" >3. Not yet assessing data readiness<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#Cach_tranh_that_bai_khi_trien_khai_EPM\" >How to avoid failure when implementing EPM<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#1_Xac_dinh_muc_tieu_va_KPI_thanh_cong_tu_dau\" >1. Define success goals and KPIs from the start<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#2_Thiet_lap_Governance_Stakeholder_Alignment\" >2. Establish Governance &amp; Stakeholder Alignment<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#3_Dam_bao_chat_luong_du_lieu_Data_Quality_Assurance\" >3. Data Quality Assurance<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#4_Dao_tao_nguoi_dung_quan_ly_thay_doi\" >4. User training &amp; change management<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#5_Trien_khai_theo_tung_giai_doan_Phased_or_Agile_Implementation\" >5. Phased or Agile Implementation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#6_Chon_doi_tac_trien_khai_uy_tin\" >6. Choose a reputable implementation partner<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#Vai_tro_cua_cong_nghe_trong_viec_tim_cach_tranh_that_bai_khi_trien_khai_EPM\" >The Role of Technology in Avoiding EPM Implementation Failure<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#1_Cloud_EPM_giup_giam_loi_van_hanh\" >1. Cloud EPM helps reduce operational errors<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#2_AI_Machine_Learning_trong_EPM_hien_dai\" >2. AI &amp; Machine Learning in Modern EPM<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#3_Cong_cu_tich_hop_tu_dong_hoa_Integration_Automation_Tools\" >3. Integration &amp; Automation Tools<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#Checklist_10_buoc_dam_bao_trien_khai_EPM_thanh_cong\" >Checklist: 10 Steps to Ensure a Successful EPM Implementation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-28\" href=\"https:\/\/bizzi.vn\/en\/epm-implementation-error\/#Ket_luan\" >Conclude<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Tai_sao_nhieu_doanh_nghiep_gap_sai_lam_trien_khai_EPM\"><\/span><b>Why do many businesses make mistakes in implementing EPM?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Avoiding failure in EPM implementation can start with understanding the nature of the software and learning from the mistakes of other businesses.\u00a0<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"1_EPM_la_gi_va_tai_sao_trien_khai_phuc_tap\"><\/span><b>1. What is EPM and why is it complex to implement?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">EPM (Enterprise Performance Management) \u2013 Enterprise Performance Management System \u2013 is a platform that helps businesses plan, forecast, report and analyze performance on the same unified system.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">EPM connects financial data \u2013 operations \u2013 human resources \u2013 sales, helping the board of directors and CFO have a comprehensive and real-time view of business performance. EPM is not just software, but an overall management system, related to data, processes, people and operational thinking. However, more than 60% EPM projects fail or do not meet expectations (according to Gartner).\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">EPM is not just software, but a comprehensive management system, related to data, processes, people and operational thinking. Therefore, common EPM errors often occur due to the following reasons:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Distributed, heterogeneous data<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Complex financial processes<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">System integration requirements<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Change your mindset and work habits<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cost and implementation time<\/span><\/li>\n<\/ul>\n<figure id=\"attachment_999979036\" aria-describedby=\"caption-attachment-999979036\" style=\"width: 512px\" class=\"wp-caption aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-999979036 size-full\" src=\"https:\/\/bizzi.vn\/wp-content\/uploads\/2025\/10\/epm-minh-bach-du-lieu.gif\" alt=\"EPM implementation error\" width=\"512\" height=\"356\" title=\"\"><figcaption id=\"caption-attachment-999979036\" class=\"wp-caption-text\">EPM is not just software, but an overall management system, involving data, processes, people and operational thinking.<\/figcaption><\/figure>\n<h3><span class=\"ez-toc-section\" id=\"2_Trien_khai_EPM_Hanh_trinh_thay_doi_van_hoa_du_lieu\"><\/span><b>2. EPM Implementation: The Journey of Changing Data Culture<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Implementing EPM (Enterprise Performance Management) is not just a technology project, but a journey to change the mindset and data culture throughout the enterprise. When EPM is introduced, the first thing that changes is not the tools, but the way the enterprise thinks and makes decisions based on data.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Being willing to change your work culture is one of the things to do in ways to avoid failure when implementing EPM:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Leaders need to promote morale <a href=\"https:\/\/bizzi.vn\/epm-minh-bach-du-lieu\/\">EPM data transparency<\/a>.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Departments need to share and synchronize data instead of working in isolation.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The finance department needs to shift its role from data entry to strategic consulting.<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"3_Sai_lam_trien_khai_EPM_Tu_cong_nghe_den_con_nguoi\"><\/span><b>3. EPM Implementation Mistakes: From Technology to People<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">In fact, many businesses invest billions of dong in EPM (Enterprise Performance Management) systems, but after a while, the project stops halfway or is not used effectively.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The common cause of EPM errors lies not only in technology, but more deeply in how businesses prepare people and processes for change.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Lack of alignment between business goals and technical implementation<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">A common mistake is that businesses view EPM as an IT project, instead of a performance management project. The system is implemented in a \u201csoftware installation\u201d direction without being linked to specific business goals. When the technical team and the finance team do not speak with the same voice, the result is a system that works but does not solve the \u201cpain\u201d of the business.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Lack of Change Management<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Implementing EPM means changing years of work habits. From manual data entry in Excel to automated models, from individual reports to centralized data \u2013 all require a change in thinking and processes.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Without an internal communications strategy, user training, and a clear transition roadmap, no matter how good an EPM system is, it&#039;s easy to get &quot;put to rest&quot; after a few months.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Project management lacks long-term vision<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Some businesses want to \u201csee results immediately\u201d, leading to hasty implementation, lacking a testing phase and evaluating actual effectiveness. This is a common mistake in EPM implementation. There is no set of indicators to measure ROI or performance after implementation, making it difficult to maintain the system in the long term.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"6_sai_lam_trien_khai_EPM_pho_bien\"><\/span><b>6 Common EPM Implementation Mistakes<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Deployment <\/span><b>EPM (Enterprise Performance Management)<\/b><span style=\"font-weight: 400;\"> is a strategic step to help businesses improve their planning, forecasting and decision-making capabilities. However, many projects do not bring about the expected results because of problems. <\/span><b>classic mistakes<\/b><span style=\"font-weight: 400;\"> hereafter.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"1_Quan_tri_du_an_yeu_Project_Governance_Failure\"><\/span><b>1. Project Governance Failure<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Enterprises deploy EPM but <\/span><b>no strong project board<\/b><span style=\"font-weight: 400;\">, lack of \u201cownership\u201d and coordination between parties (finance \u2013 IT \u2013 consulting). Many decisions are delayed, project scope continuously expands (\u201cscope creep\u201d), causing delays and budget overruns.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"2_Du_lieu_kem_chat_luong_Data_Quality_Integration_Issues\"><\/span><b>2. Poor Data Quality &amp; Integration Issues<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">EPM is only as strong as the data input. If data from ERP, CRM or Excel is incorrect, the system will be \u201cgarbage in \u2013 garbage out\u201d (<\/span><i><span style=\"font-weight: 400;\">Garbage In, Garbage Out<\/span><\/i><span style=\"font-weight: 400;\">). Lack of standardization of account codes, product categories, or consolidation rules makes reporting results unreliable.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"3_Thieu_dao_tao_va_quan_ly_thay_doi_Training_Change_Management\"><\/span><b>3. Lack of training and change management<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Users familiar with Excel are often reluctant to switch to a new system. Without training and an explanation of the value of EPM, they will avoid using it or enter data incorrectly.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"4_Over-Customization_Technical_Complexity\"><\/span><b>4. Over-Customization &amp; Technical Complexity<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Many businesses want \u201cEPM to do it all\u201d and require deep customization, making the system complex, difficult to maintain and expensive. This is contrary to the \u201cBest Practice\u201d spirit of EPM \u2013 standardizing processes, not having to reprogram from scratch.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"5_Khong_xac_dinh_KPI_va_ROI_ro_rang\"><\/span><b>5. Not defining clear KPIs and ROI<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">If not specified <\/span><b>success measurement goals<\/b><span style=\"font-weight: 400;\">, businesses will not know how to avoid failure when implementing EPM, and even less know whether the EPM system is &quot;worth the money&quot; or not. Indicators such as <\/span><b>planning time, reporting speed, forecast accuracy<\/b><span style=\"font-weight: 400;\"> need to be measured before and after implementation.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"6_Thieu_ngan_sach_hoac_sai_uoc_luong_chi_phi\"><\/span><b>6. Under-budget or incorrect cost estimates<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Many businesses only calculate the cost of the software, but <\/span><b>Forgetting the costs of data, integration, training, and operations<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">When budgets are exceeded, projects are stopped or scope is reduced, causing the system to lose overall value.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Nguyen_nhan_goc_re_cua_trien_khai_EPM_that_bai\"><\/span><b>Root Causes of Failed EPM Implementations<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Deployment <\/span><b>EPM (Enterprise Performance Management)<\/b><span style=\"font-weight: 400;\"> It&#039;s not just about installing a software, but <\/span><b>project to completely restructure the way a business operates and makes decisions<\/b><span style=\"font-weight: 400;\">. <\/span>Therefore, the common EPM implementation mistakes that lead to failure often do not come from technology, but from lack of preparation in strategy, data and people.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"1_Thieu_ke_hoach_tong_the_va_roadmap_ro_rang\"><\/span><b>1. Lack of a clear master plan and roadmap<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Many businesses begin to implement EPM <\/span><b>without a long-term vision<\/b><span style=\"font-weight: 400;\"> \u2013 focusing only on one module or short-term problem (e.g. budget planning), without defining a roadmap for future expansion.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The result is:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The operating system is discrete and not scalable.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">New modules have to be \u201cpatched\u201d later, increasing costs and complicating the data structure.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Users do not see the \u201cbig picture\u201d and therefore lack commitment to using the system.<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"2_Thieu_lien_ket_giua_tai_chinh_IT\"><\/span><b>2. Lack of connection between finance &amp; IT<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">EPM is a unique project: technology for financial operations. But in reality, these two departments often work in parallel, not in the same direction:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Finance understands the business, but not the technical.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">IT understands the system, but not the logic of planning, forecasting, or consolidated reporting.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">When both sides do not go together, the project is likely to encounter the following situation:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Build the system correctly technically but wrongly in practice.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Too dependent on outside consultants, no internal succession team.<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"3_Chua_danh_gia_san_sang_du_lieu_data_readiness\"><\/span><b>3. Not yet assessing data readiness<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">EPM is a data-driven platform \u2013 if the input data is incorrect, the system cannot function properly. However, most businesses <\/span><b>skip the data quality and readiness assessment phase<\/b><span style=\"font-weight: 400;\"> before starting.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Common EPM errors include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Data is scattered across multiple sources (ERP, Excel, CRM\u2026).<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">There is no uniform rule for account codes, units, and expense categories.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Data lacks history or has no time normalization.<\/span><\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Cach_tranh_that_bai_khi_trien_khai_EPM\"><\/span><b>How to avoid failure when implementing EPM<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Implementing EPM (Enterprise Performance Management) is a journey to restructure the way a business operates, plans, and makes decisions. Success comes not only from good technology, but also from the right implementation strategy, solid data, and human engagement.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Below are six core principles that help businesses avoid failure when implementing EPM.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"1_Xac_dinh_muc_tieu_va_KPI_thanh_cong_tu_dau\"><\/span><b>1. Define success goals and KPIs from the start<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">EPM only truly delivers value when tied to <\/span><b>specific business goals<\/b><span style=\"font-weight: 400;\"> Businesses need to clearly define:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">What is the main goal of the project? (e.g., shorten planning cycles, improve forecast accuracy, consolidate data faster\u2026)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">What is a successful KPI? (e.g., reduce budgeting time by 40%, achieve forecast accuracy &gt;90%)<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"2_Thiet_lap_Governance_Stakeholder_Alignment\"><\/span><b>2. Establish Governance &amp; Stakeholder Alignment<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">An EPM project requires strong project governance and stakeholder alignment.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Specifically:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Establish a Steering Committee consisting of CFO, CIO, and key users.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Clearly define the roles - responsibilities - decision-making rights of each party.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Maintain regular review sessions to make timely adjustments.<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"3_Dam_bao_chat_luong_du_lieu_Data_Quality_Assurance\"><\/span><b>3. Data Quality Assurance<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">EPM is only strong when <\/span><b>input data is accurate, clean and consistent.<\/b><span style=\"font-weight: 400;\"> Before implementation, businesses need to:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Standardize account categories, product codes, and organizational units.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Check consistency between ERP, CRM, HRM systems\u2026<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Build the process <\/span><b>Data Governance<\/b><span style=\"font-weight: 400;\"> and the person responsible for updating the data (data owner).<\/span><\/li>\n<\/ul>\n<figure id=\"attachment_999979044\" aria-describedby=\"caption-attachment-999979044\" style=\"width: 749px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"wp-image-999979044 size-full\" src=\"https:\/\/bizzi.vn\/wp-content\/uploads\/2025\/10\/sai-lam-trien-khai-epm.avif\" alt=\"EPM implementation error\" width=\"749\" height=\"469\" title=\"\" srcset=\"https:\/\/bizzi.vn\/wp-content\/uploads\/2025\/10\/sai-lam-trien-khai-epm.avif 749w, https:\/\/bizzi.vn\/wp-content\/uploads\/2025\/10\/sai-lam-trien-khai-epm-300x188.jpg 300w, https:\/\/bizzi.vn\/wp-content\/uploads\/2025\/10\/sai-lam-trien-khai-epm-18x12.jpg 18w\" sizes=\"(max-width: 749px) 100vw, 749px\" \/><figcaption id=\"caption-attachment-999979044\" class=\"wp-caption-text\">Avoiding EPM (Enterprise Performance Management) implementation mistakes comes not just from good technology, but from the right implementation strategy, solid data, and human buy-in.<\/figcaption><\/figure>\n<h3><span class=\"ez-toc-section\" id=\"4_Dao_tao_nguoi_dung_quan_ly_thay_doi\"><\/span><b>4. User training &amp; change management<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">EPM not only changes processes, but also <\/span><b>change work habits<\/b><span style=\"font-weight: 400;\"> Therefore, businesses need a systematic internal training and communication plan to avoid making mistakes in EPM implementation:<\/span><\/p>\n<p><b>Role-based training plan:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Admin:<\/b><span style=\"font-weight: 400;\"> System operation and configuration.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Analyst:<\/b><span style=\"font-weight: 400;\"> Analyze, plan, run reports.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Viewer:<\/b><span style=\"font-weight: 400;\"> Access, view dashboards and summary metrics.<\/span><\/li>\n<\/ul>\n<p><b>Internal communication:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Explain <\/span><i><span style=\"font-weight: 400;\">Why is the transition to EPM necessary?<\/span><\/i><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Emphasize <\/span><i><span style=\"font-weight: 400;\">Specific benefits for each department<\/span><\/i><span style=\"font-weight: 400;\"> to increase adoption rate.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Select the system that has <\/span><b>familiar interface<\/b><span style=\"font-weight: 400;\">\u00a0to reduce barriers to use.<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"5_Trien_khai_theo_tung_giai_doan_Phased_or_Agile_Implementation\"><\/span><b>5. Phased or Agile Implementation<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">A common EPM mistake is rolling it out in a big, unplanned fashion. Instead of rolling it all out at once, <\/span><b>divided into phases or modules.<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400;\"> For example:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>State 1:<\/b><span style=\"font-weight: 400;\"> Budget Planning.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Phase 2:<\/b><span style=\"font-weight: 400;\"> Reports &amp; Dashboards.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Phase 3:<\/b><span style=\"font-weight: 400;\"> Forecasting &amp; Scenario Planning.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Approach <\/span><b>Agile or Phased Implementation<\/b><span style=\"font-weight: 400;\"> help:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Easy to test and adjust.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Shorten \u201cGo-Live\u201d time.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reduce risk when expanding the system.<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"6_Chon_doi_tac_trien_khai_uy_tin\"><\/span><b>6. Choose a reputable implementation partner<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Not all vendors understand FP&amp;A. Businesses should choose partners with experience in finance and performance management, not just technical expertise.<\/span><span style=\"font-weight: 400;\">Examples of popular EPM platforms include: Oracle EPM, SAP BPC, Anaplan, IBM Planning Analytics\u2026<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Vai_tro_cua_cong_nghe_trong_viec_tim_cach_tranh_that_bai_khi_trien_khai_EPM\"><\/span><b>The Role of Technology in Avoiding EPM Implementation Failure<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">In financial management, data errors are the \u201csilent enemy\u201d that reduces the reliability of reports, prolongs planning time and causes businesses to delay decision making. Modern EPM technology \u2013 especially Cloud, AI, and automation platforms \u2013 is becoming a smart layer of protection to eliminate this risk.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"1_Cloud_EPM_giup_giam_loi_van_hanh\"><\/span><b>1. Cloud EPM helps reduce operational errors<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Cloud-based EPM solutions provide stability, standardization, and centralized control.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\"> Unlike separate Excel files or on-premise systems that are difficult to synchronize, Cloud EPM:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Centralize data on a single platform, ensuring a \u201csingle source of truth\u201d.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Automatically save versions (version control), avoid confusion when multiple people edit at the same time.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Clear access permissions reduce the risk of data overwriting or incorrect operations.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Real-time updates ensure all changes are reflected immediately across the system.<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"2_AI_Machine_Learning_trong_EPM_hien_dai\"><\/span><b>2. AI &amp; Machine Learning in Modern EPM<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Technology <\/span><b>AI (Artificial Intelligence)<\/b><span style=\"font-weight: 400;\"> and <\/span><b>Machine Learning<\/b><span style=\"font-weight: 400;\"> are being deeply integrated into EPM platforms to support smarter data forecasting and control. Specifically:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Anomaly Detection:<\/b><span style=\"font-weight: 400;\"> AI automatically alerts when there are unusual or deviant data.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Predictive Forecasting:<\/b><span style=\"font-weight: 400;\"> Machine Learning analyzes historical data to create more accurate forecasts, reducing reliance on manual estimates.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Scenario Modeling:<\/b><span style=\"font-weight: 400;\"> AI enables simulation of multiple \u201cWhat-if\u201d scenarios to support strategic decision making.<\/span><\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"3_Cong_cu_tich_hop_tu_dong_hoa_Integration_Automation_Tools\"><\/span><b>3. Integration &amp; Automation Tools<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Common EPM errors often arise when data has to go through many separate systems \u2013 ERP, CRM, HRM, Excel\u2026 Modern integration technology helps <\/span><b>seamless connection<\/b><span style=\"font-weight: 400;\"> These systems ensure data consistency and eliminate manual operations.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Checklist_10_buoc_dam_bao_trien_khai_EPM_thanh_cong\"><\/span><b>Checklist: 10 Steps to Ensure a Successful EPM Implementation<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Implementing EPM (Enterprise Performance Management) is not just a technology project \u2013 it is a project to transform financial and data management. To avoid mistakes in implementing EPM and ensure success, businesses need to prepare carefully through the following 10 steps:<\/span><\/p>\n<table class=\"aligncenter\" style=\"width: 47.1352%;\">\n<tbody>\n<tr>\n<td style=\"width: 15.6627%;\"><b>Step<\/b><\/td>\n<td style=\"width: 45.0947%;\"><b>Act<\/b><\/td>\n<td style=\"width: 38.21%;\"><b>Expected results<\/b><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 15.6627%;\"><span style=\"font-weight: 400;\">first<\/span><\/td>\n<td style=\"width: 45.0947%;\"><span style=\"font-weight: 400;\">Assess current situation and goals<\/span><\/td>\n<td style=\"width: 38.21%;\"><span style=\"font-weight: 400;\">Define Scope &amp; ROI<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 15.6627%;\"><span style=\"font-weight: 400;\">2<\/span><\/td>\n<td style=\"width: 45.0947%;\"><span style=\"font-weight: 400;\">Establish a project team (Project Governance)<\/span><\/td>\n<td style=\"width: 38.21%;\"><span style=\"font-weight: 400;\">Clear responsibilities<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 15.6627%;\"><span style=\"font-weight: 400;\">3<\/span><\/td>\n<td style=\"width: 45.0947%;\"><span style=\"font-weight: 400;\">Data quality check<\/span><\/td>\n<td style=\"width: 38.21%;\"><span style=\"font-weight: 400;\">Clean, unified data<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 15.6627%;\"><span style=\"font-weight: 400;\">4<\/span><\/td>\n<td style=\"width: 45.0947%;\"><span style=\"font-weight: 400;\">Choose the right vendor<\/span><\/td>\n<td style=\"width: 38.21%;\"><span style=\"font-weight: 400;\">Compatible solutions<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 15.6627%;\"><span style=\"font-weight: 400;\">5<\/span><\/td>\n<td style=\"width: 45.0947%;\"><span style=\"font-weight: 400;\">Set up KPIs to measure success<\/span><\/td>\n<td style=\"width: 38.21%;\"><span style=\"font-weight: 400;\">Accurate ROI tracking<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 15.6627%;\"><span style=\"font-weight: 400;\">6<\/span><\/td>\n<td style=\"width: 45.0947%;\"><span style=\"font-weight: 400;\">Pilot<\/span><\/td>\n<td style=\"width: 38.21%;\"><span style=\"font-weight: 400;\">Learn from your initial mistakes<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 15.6627%;\"><span style=\"font-weight: 400;\">7<\/span><\/td>\n<td style=\"width: 45.0947%;\"><span style=\"font-weight: 400;\">User training &amp; communications<\/span><\/td>\n<td style=\"width: 38.21%;\"><span style=\"font-weight: 400;\">Increase adoption rate<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 15.6627%;\"><span style=\"font-weight: 400;\">8<\/span><\/td>\n<td style=\"width: 45.0947%;\"><span style=\"font-weight: 400;\">Analyze feedback after each stage<\/span><\/td>\n<td style=\"width: 38.21%;\"><span style=\"font-weight: 400;\">Continuous improvement<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 15.6627%;\"><span style=\"font-weight: 400;\">9<\/span><\/td>\n<td style=\"width: 45.0947%;\"><span style=\"font-weight: 400;\">ERP &amp; BI Integration<\/span><\/td>\n<td style=\"width: 38.21%;\"><span style=\"font-weight: 400;\">Uninterrupted data flow<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 15.6627%;\"><span style=\"font-weight: 400;\">10<\/span><\/td>\n<td style=\"width: 45.0947%;\"><span style=\"font-weight: 400;\">Periodic ROI Assessment<\/span><\/td>\n<td style=\"width: 38.21%;\"><span style=\"font-weight: 400;\">Ensure the project achieves real value<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>\u00a0<\/strong><\/p>\n<p><span style=\"font-weight: 400;\">Avoiding failure in EPM implementation is not only based on strong software, but also on consensus, clear planning and proper implementation.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Ket_luan\"><\/span><b>Conclude<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">In reality, mistakes in implementing EPM do not come from technology, but from strategy and people. Common EPM system errors that often occur during implementation show that no matter how strong a system is, it will not bring value without clear direction, effective change management and consensus from the finance and leadership team.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Conversely, a properly planned implementation will turn EPM into a strategic tool that helps CFOs and FP&amp;A:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Enterprise-wide performance management based on transparent data.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Plan, forecast and make decisions faster and more accurately.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Shifting the role of finance from \u201creporting the past\u201d to \u201ccreating the future\u201d.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">In the data age, CFOs are not just cost managers \u2013 they are strategic leaders for the business. EPM solutions are more than just software; they are platforms that help CFOs transform from cost controllers into strategic value creators.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">With a team of FP&amp;A experts and financial consultants experienced in implementing EPM for hundreds of Vietnamese businesses, Bizzi offers:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">International standard implementation method, flexible according to the characteristics of Vietnamese enterprises.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Support service in Vietnamese, on-site &amp; online 24\/7.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Commit to measurable results (ROI, Accuracy, Cycle Time) after implementation.<\/span><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Technology is just a tool \u2013 people and data are the real foundation of performance transformation. Wrong\u2026<\/p>","protected":false},"author":56,"featured_media":999979045,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","inline_featured_image":false,"footnotes":""},"categories":[54],"tags":[],"class_list":["post-999979043","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-so-tay-ke-toan"],"acf":[],"_links":{"self":[{"href":"https:\/\/bizzi.vn\/en\/wp-json\/wp\/v2\/posts\/999979043","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bizzi.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bizzi.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bizzi.vn\/en\/wp-json\/wp\/v2\/users\/56"}],"replies":[{"embeddable":true,"href":"https:\/\/bizzi.vn\/en\/wp-json\/wp\/v2\/comments?post=999979043"}],"version-history":[{"count":3,"href":"https:\/\/bizzi.vn\/en\/wp-json\/wp\/v2\/posts\/999979043\/revisions"}],"predecessor-version":[{"id":999980446,"href":"https:\/\/bizzi.vn\/en\/wp-json\/wp\/v2\/posts\/999979043\/revisions\/999980446"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bizzi.vn\/en\/wp-json\/wp\/v2\/media\/999979045"}],"wp:attachment":[{"href":"https:\/\/bizzi.vn\/en\/wp-json\/wp\/v2\/media?parent=999979043"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bizzi.vn\/en\/wp-json\/wp\/v2\/categories?post=999979043"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bizzi.vn\/en\/wp-json\/wp\/v2\/tags?post=999979043"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}